Construction

by Asean
Cambodia Construction
Cambodia Construction
Construction Permission Obtain application form Agency: Municipal Department of Land Management, Construction and Urban Planning   The application form and list of supporting documents must be picked up from the Municipal
by Asean
Laos Construction
Laos Construction
Construction Permission Obtain a Soil Test from the State Enterprise Agency: State Enterprise Soil test is obtained a part of the pre-construction and design phase and is often required by supervising engineers who conduct
by Asean
Philippines Construction
Philippines Construction
Construction Permission Obtain a Geotechnical study / Soil test Agency: Private firms BuildCo will request a soil boring test for the structural calculations for the foundation. While the soil test is not required by law, it is
by Asean
Myanmar Construction
Myanmar Construction
Construction Permission Obtain Soil Investigation Report Agency: Private Engineering Company BuildCo needs to obtain a soil investigation report prior to submitting application for building permit. The report can be obtained from
by Asean
Indonesia Construction
Indonesia Construction
Construction Permission Request and obtain notarized copy of land ownership certificate Agency: Notary BuildCo must notarize a copy of the land ownership certificate before applying for the building permit. Time and cost
by Asean
Malaysia Construction
Malaysia Construction
Construction Permission Obtain technical conditions from the Water Authority SYABAS Agency: Water Authority SYABAS The principal submitting person (PSP), representing BuildCo, will visit the Water Authority SYABAS to obtain the
by Asean
Singapore Construction
Singapore Construction
Construction Permission Hire certified Qualified Professionals to apply for project approvals and supervise construction Agency: External Qualified Professionals BuildCo. must hire independent, external and certified
by Asean
Thailand Construction
Thailand Construction
Construction Permission Obtain a Soil Test for the Foundation Agency: Private Firm A soil test is conducted prior to designing the foundation of the warehouse. Soil in Bangkok differs depending on the location and soil tests are
by Asean
Brunei Construction
Brunei Construction
Construction Permission Obtain a copy of the survey plan Agency: Survey Department A survey plan is a mandatory document that must be presented when requesting a building permit. Time and cost: 1 day, BND 15 Land Surveyor
by Asean
Vietnam Construction
Vietnam Construction
Construction Permission Obtain the certification of the designs from the Police Department for Fire Fighting and Fire Prevention of Ho Chi Minh City Agency: Police Department for Fire Fighting and Fire Prevention of Ho Chi Minh City